Location: Tripoli – Libya
Duration: 28.04.2009 – 28.01.2010 (9 months)
Project Type: Cultural and Commercial
Status: Completed
Construction Area: 23.000 m²
Location: Tripoli – Libya
Duration: 28.04.2009 – 28.01.2010 (9 months)
Project Type: Cultural and Commercial
Status: Completed
Construction Area: 23.000 m²
Project; includes all construction, mechanical, electrical, electronic infrastructure and landscape works. The main structure is steel construction (3000 tons). The project includes a VIP lounge, a restaurant, a main conference hall for 1000 people, two conference rooms for 150 people, a press room, a meeting room and a technical service center. Furniture is also in business. Design projects were also prepared by our company.
Login
Tripoli International Convention Center for 3,000 people is the first and most modern conference hall located in the center of Tripoli.
Construction of the building started on 25.05.2009 and was opened to the public on 15.02.2010 after eight months. These construction works include design, landscape and infrastructure works.
It is easy to reach the important points of the city from the conference hall, which is 35 km away from the airport and located in the center of Tripoli. It is among the luxury hotels, sports facilities and libraries with a vast greenery consisting of pine trees and eucalyptus trees.
The construction, which is under the supervision of System Insaat, was completed in 260 days in a shorter time than planned.
This building complex provides all kinds of comfort by offering the opportunity to hold many meetings at the same time.
The center was built on an area of 51,500 square meters.
The facilities offered at the Congress Center are:
26,500 square meter building area
Conference Hall (2)
Ministry Lounge
Main Hall
Prime Ministry Lounge
Prime Ministry Hall
VIP Meeting Lounge
Meeting room
Press room
Restaurant and Kitchen
VIP Lounge
33.600 m² Green Area
2.400 m² Technical Service Center.
What makes this building special and unique is the use of architectural facades and cladding systems for the first time in the world. This application was used as a decorative, cooling part by using approximately 9.000 m² porous coating.
A new construction method used on the other facade is a suspended coating consisting of glass columns of 14 meters in height.
Another state-of-the-art design used in the Congress Center is the ability to control the sound and lighting system installed from a single screen. This system (MPDP) is one of the largest screens used in similar congress centers around the world.
This building is the first modern and unique congress center built in Libya and the new system is based on steel construction foundation.
The largest part of this building is the 3476 m² main meeting hall, with 56 meters of cut beams and approximately 6250 tons of steel construction.
Energy Water Heating Control underground structure is managed from the technical service center and the substation control center building.
The Congress Center was built to withstand high intensity earthquakes.
Modern LED lighting systems used in different parts of the building are approximately 21 kilometers long.
The weight of a total of 10,000 decorative lighting units used in this building is 45.5 tons.
Thanks to the experience and works of System Insaat, Tripoli Congress Center Building was opened on 15.02.2010.